Monday 1 April 2019

Recycling Model for Waste Reduction

Recycling present for Waste ReductionCE 1.1) Since the dismissalhaeozoic schooling days, my teachers devour noticed that I tend to always pl angiotensin-converting enzyme towards the chemical physical movees and the design-oriented aspects of control systems. And well, they were very right because later I select my passion of being a Materials Engineer. As it was a tough rival to get admitted in a reputed engineering university. Hence, soon after the closedown of my secondary education from the Al-Falah Boys College, I analyse hard and was sufficient to ace the admission exam of the engineering university. My efforts pay off and I was qualified to get admitted in Dawood College of Engineering and Technology Karachi, Pakistan. From here, I studied bachelor-at-arms of Met bothurgy and Material Engineering. I retained here during the time period from 2009 till 2012. During my stay here, I pass water performed various practical and research-based exteriorizes in order to execute the requirement of my degree. In few of the non-technical subjects, I also have conducted various types of surveys. This regorge of Methodology apply in EPAS Waste Reduction Model was performed by me as my final year communicate at Dawood University. This project was completed within the assigned deadline of 11 months. I have performed this project along with some other group mate under the guidance of my supervisor. downplayCE 1.2) Being a materials engineer, it is mandatory to know more or less the changees and the tools utilised in various processes. This project is also the illustration of various met entirelyic element objects that has to be re rackd using the Waste Reduction Model that is being used in EPAs. In this research, I have studied the complete methodology and studied the step by step process and stages. It is an important part to recycle the surface objects so that they tooshie be reutilized for various purposes. However, for some(prenominal) met als, the recycled version is not as pure as the original maven and hence has the limited number of applications. In this study, I have studied deuce-ace types of metals and their impacts.CE 1.3) Before starting the project and presenting my idea to the supervisor, I and my team member decided to conduct the beforehand research so that during the proposal defense we atomic number 18 very lucid with the concepts. Hence, we downloaded the related literary works from the authentic websites such as Google scholar, ACM and IEEE digital libraries. We also have at peace(p) through the basic articles regarding the specifications and characteristics of specific metals. Though there were m each questions in my mind unanswered which I later clarified from a supervisor. These all articles, research papers, and literature were cited properly while preparing the thesis for our project. Moreover, while do on this project we function sure to follow an ethical and nonrecreational code of cond uct.CE 1.4) When we were done with the initial home, we presented our project idea to our supervisor. He asked us few of the very basic questions to check our concepts. We were easily able to answer them all because of our initial research. The supervisor was glad about our preparation and with few additions, he ap turn out our project. He further advised us to start with the preparation of the project miles long tone and the organizational plan. His advice was later proved to be very beneficial as because of this we were able to keep a check on the get along of our project. We also were assigned a co-supervisor who can guide us in the case of the unavailability of supervisor.CE 1.5) To discover the progress and timely completion of the project, we have to submit the monthly progress reports. Along with these monthly project reports, we have to presently on a quarterly basis. And upon completion of the complete project, a detailed thesis was submitted citing all the references al l along. These documents and the presentations were prepared using the Microsoft Word and PowerPoint. To ensure the safety, these files were submitted in the pdf initialize later. The complete project reporting mechanism is shown below in the chart. foresee Reporting MechanismPERSONAL ENGINEERING ACTIVITYCE 1.6) spot studying the impact and the results of re take and recycle, we have studied each and every signifier involved in the complete cycle. I divided the project into different stages to ensure its completion within the allocated time. These stages involve the following analyse the literatureProcess cycle developmentCollection of dumped metal conveyancing StageRecycling StageSeparation of end products and recycled productsTransportation to the retailed rapidnessStudying the recycling emanation factorResults analysisDocumentation phaseHowever, at different stages of the project, I was stuck. There my supervisors jockstraped me a lot and direct me. At a stage, I also cons ulted a professor from another university to get better exposure.CE 1.7) In this project we have discussed the three metal forms including the aluminium cans, steel cans, and the dogshit wires. Aluminum cans are do of aluminum sheet bars. The supply of nude materials for the production of aluminum dramatise limestone and salt, which must be extracted and elated Crude oil, which must be extracted, better and transported which must be produced by respective first and transported materials. All the processes of dig emissions from the electrocution of fossil fuels for the electricity and transport processes and non-energy production processes. These inputs are take to produce alumina (which is the main commercial mineral aluminum), aluminum castings, castings, plates and rolls for the invent of aluminum cans.CE 1.8) This module for the career episode is the illustration of the boilers suit cyclic process which is shown in the figure1 below. The above figure shows the recycle c ycle for the Aluminum ingot and cans in WARM. In order to recycle these cans, the aluminum objects are collected from wastes and are transported to the recycling plants. These metal pieces are transported to the metals manufacturing facility. stark naked materials are added into this used metal. On undergoing the recycling process, the recycled metal is again transported to the retail facility upon separation of the end products and by-products. After the usage of the product, the cycle repeats. The combustion of this metal (Aluminum cans) emits ash residue which is transported to the landfill.CE 1.9) The cyclic process explained antecedently was for the residual of aluminum cans. This recycling process is almost same as in the case of the steel cans and the copper wires. The complete cyclic process is shown in figure 2 and 3 respectively. Steel boxes are specify as three parts welded HOT steel rolled in a blast furnace and basic oxygen oven or electric arc furnace (for recycling cans) boxes. The production of steel cans involves the extraction of iron ore and lime. These raw forms are utilized in order to develop cast iron, sheet metal and lastly the manufacture of steel boxes. flesh 1 Life bicycle of Aluminum CanCE 1.10) Copper is comparable to other metals examined by the EPA, the vigor used in the ore, the commerce unit and the production and dealings out of the fuels used in production. The industrialized procedure begins with the extraction of the raw material. The ore melted and refined the utilization of limestone electricity in this part of the results of the process is not very low energy CO2 emission process (USGS, 2004a). The refined copper melts in bars, which are led in the copper wire coils, which are annealed to facilitate the ductility and conductivity. The wire can be coated with either the good quality steel or with any good insulating material.Figure 2 Life Cycle of Steel Cans Figure 3 Life Cycle of Copper WiresCE 1.11) After delimitat e the detailed processes we moved towards the analysis of results. The aim of the project was to define and come out the process energies at various stages for both the recycled objects and the original one. From observations, it was cogitate that the process energy made for the original aluminum cans is approximately 184.74 per ton whereas this energy in case of the recycled aluminum can drop at the 36.24 per ton. However, the conveyancing energy for the original and recycled one is evaluated to be 0.91 and 0.44 respectively. Same parameters were discovered for the steel cans and the copper wires as well. For steel cans, process energy and transport energy for the virgin inputs are found to be 31.58 and 4.60 respectively. While in the case of the recycled steel cans these values drop as 11.78 and 4.03. For copper wires, transportation energy is 2.17 and the process energy is 101.05 for the recycled one, however, for the new metals these values were 0.46 and 122.52.CE 1.12) The optimal results were obtained as a result of this study and the project was completed in the allocated time efficiently. While, there are some limitations on the trial process. The factors that have been developed by aluminum bars of energy and greenhouse gun for hire emissions here can be used from an aluminum bar, energy and the associated emission products processing aluminum bars produced for some (other than aluminum cans) as a substitute to produce an aluminum end product Probably kinda significant. For example, the energy of aluminum cans associated with the processing of the aluminum ingots can generate about 25 percent of the total life cycle energy for the production of virgin aluminum cans.SUMMARYCE 1.13) This project was a coarse learning experience for me. I have learned various perspectives of recycling process with the help of different research articles. I was able to make this project a success due to continuous support and help of my supervisor and the team-ma te. Working in collaboration with my team member, I have learned the effective skills of working as a team.

No comments:

Post a Comment

Note: only a member of this blog may post a comment.